
SikaCoat®-300 Cool
SikaCoat®-300 Cool is an elastic covering of creamy consistency, using styrene-acrylic copolymers in watery emulsion which, once dry, forms a flexible, waterproofing and durable film.
- Environmentally preferred coating: water based,non-toxic and eco-friendly
- Elastic waterproofing membrane
- Excellent UV stability
- High weather resistance
- Easy application by roller, brush or sprayed
- Good bonding to various substrates
- Excellent hiding power
- Crack bridging ability
Usage
Waterproofing:- Flat and sloping fully exposed roof structures
- New construction and refurbishment projects
- External walls
- Roofs with numerous details such as penetrations, drains, roof lights and complex geometry
- Concrete
- Mortar
- Cementitious substrates
- Brick
- Roof tiles
- Steel, zinc, aluminium and metal
Advantages
- Environmentally preferred coating: water based,non-toxic and eco-friendly
- Elastic waterproofing membrane
- Excellent UV stability
- High weather resistance
- Easy application by roller, brush or sprayed
- Good bonding to various substrates
- Excellent hiding power
- Crack bridging ability
Packaging
- 4 kg pail
- 20 kg pail
Colour
- White
- Grey
- Also available in other colours upon request. (Subject to minimum order quantity)
Product Details
APPROVALS / STANDARDS
Singapore Green Label 032-118-3892 "Environmentally Preferred Coating" in accordance to SEC Green Label Category 32: Paint and Surface Coatings.
Composition
Watery emulsion using styrene-acrylic copolymers
Shelf Life
12 months from date of production
Storage Conditions
Store properly in original, unopened, undamaged sealed packaging in dry condition at temperature between +5 °C and +30 °C. Protect from direct sunlight.
Density
~1.25 g/l
Volatile organic compound (VOC) content
< 25 g/l
System Structure
For wall
Primer | SikaCoat®-300 Cool diluted with 15–20 % clean water | 0.3 kg/m² (Undiluted) |
First coat | SikaCoat®-300 Cool | 0.35 kg/m² |
Second coat | SikaCoat®-300 Cool | 0.35 kg/m² |
For roof
Primer | SikaCoat®-300 Cool diluted with 15–20 % clean water | 0.3 kg/m² (Undiluted) |
Top coat | SikaCoat®-300 Cool | 0.6 kg/m² |
Second coat | SikaCoat®-300 Cool | 0.6 kg/m² |
The consumption above are approximates and does not include wastages. For porous substrates, the consumption may be higher.
Tensile Strength
~0.8 MPa | (ASTM D412) |
Adhesion in Peel
~1.2 N/mm² | (EN 1542) |
Application
Ambient Air Temperature
+5 °C min. / +35 °C max.
Substrate Temperature
+5 °C min. / +35 °C max.
Substrate Moisture Content
< 4 % pbw
Test method: Sika®-Tramex meter, CM - measurement or oven-dry-method.
No rising moisture according to ASTM (Polyethylene-sheet)
Waiting Time / Overcoating
Minimum | 2–3 hours at +30 °C |
Maximum | ~2 days at +30 °C |
Applied Product Ready for Use
~72 hours at +30 °C
SUBSTRATE PREPARATION
Substrates must be free of standing water (no puddles) clean and free of all contaminants such as dirt, oil, grease, coatings, laitance, surface treatments and loose friable material.
All existing coating / membrane, dust, loose and friable material must be completely removed from all surfaces before application of SikaCoat®-300 Cool, and associated system products, by industrial vacuuming equipment.
The substrate must be sound and of sufficient strength. Weak concrete must be removed and surface defects such as blowholes and voids must be fully exposed.
To confirm adequate surface preparation and product adhesion, carry out a trial before full application together with adhesion tests.
MIXING
Mix SikaCoat®-300 Cool (manually or with a low-revolution mixer) until it is completely homogeneous.
APPLICATION
Dilute SikaCoat®-300 Cool with 15–20 % of clean water. Stir gently until the mix is homogenous and a uniform colour is achieved. Using a short hair wool roller, brush or by airless spray, apply a layer of the diluted SikaCoat®-300 Cool onto the substrate, observing that it penetrates well in all the cracks.
After the primer has dried (> 3 hours at +30 °C), apply successive layers of SikaCoat®-300 Cool to the desired film thickness. Ensure the previous layer is completely dry before applying the next layer.
CLEANING OF TOOLS
Clean all tools and application equipment with water immediately after use. Hardened material can only be removed mechanically.