SikaTop® Armatec®-110 EpoCem®
SikaTop® Armatec®-110 EpoCem® is a three-part, cementitious, epoxy resin coating material. It contains a corrosion inhibitor and is used as a reinforcement corrosion protection and as a bonding primer. Based on EpoCem® technology, it offers superior bonding properties. SikaTop® Armatec®-110 EpoCem® meets the requirement of EN 1504-7.
- Very good bonding properties
- Compatible with most Sika MonoTop® and SikaEmaco® repair mortars
- Very good adhesion to concrete and steel
- Contains corrosion inhibitors
- Very good resistance to water and chloride penetration
- High shear strength
- Long pot life
- Easy to mix and apply
- Can be applied by brush or spray gun
Usage
As part of a concrete repair system, SikaTop® Armatec®-110 EpoCem® is used as:- Bonding primer on concrete surfaces
- Reinforcement corrosion protection
- Control of anodic areas (Principle 11, method 11.1 of EN 1504-9), creating conditions in which potentially anodic cathodic areas of reinforcement are unable to take part
- The Product is not suitable as a bonding primer for fast-setting concrete or fast-setting repair mortars
Advantages
- Very good bonding properties
- Compatible with most Sika MonoTop® and SikaEmaco® repair mortars
- Very good adhesion to concrete and steel
- Contains corrosion inhibitors
- Very good resistance to water and chloride penetration
- High shear strength
- Long pot life
- Easy to mix and apply
- Can be applied by brush or spray gun
Packaging
20 kg kit consisting of:
Part A | 1.14 kg container |
Part B | 2.86 kg container |
Part C | 16 kg bag |
Colour
Part A | White |
Part B | Colourless |
Part C | Dark grey |
Mixed components: dark grey
Product Details
ENVIRONMENTAL INFORMATION
LEED v2009 IEQc 4.2 SikaTop® Armatec®-110 EpoCem®
LEED v4.1 MR: Material ingredients (option 2) and LEED v4.1 EQ: Low-emitting materials SikaTop® Armatec®-110 EpoCem® en
Environmental Product Declaration (EPD) in accordance with EN 15804. EPD independently verified by Institut für Bauen und Umwelt e.V. (IBU)
CERTIFICATES AND TEST REPORTS
-
CE marking and declaration of performance based on EN 1504-7:2006 Products and systems for the protection and repair of concrete structures — Reinforcement corrosion protection
-
Prüfungszeugnis Korrosionsschutzwirkung SikaTop Armatec-110 EpoCem, BAM
-
Test report Corrosion Protection EN 15183, iSK, No. UB300/07/08
-
Test report stress strain behaviour, EN 1766, Polymer Institut, No. P 2965
-
Carbon dioxide permeability of coating materials and systems EN 1062-6, SikaTop Armatec-110 EpoCem, LPM AG, Test Report No. A-40'046-1E
-
Chlorid Diffusion test report, Polymer Institut. No. P 3074
Composition
Cement, epoxy resin, selected aggregates and additives
Shelf Life
12 months from date of production
Storage Conditions
Store properly in undamaged original, sealed packaging; in dry cool conditions between +5 °C and +25 °C.
Density
Mixed density | 2.0 kg/L |
System Structure
SikaTop® Armatec®-110 EpoCem® is a reinforcement corrosion protection primer in accordance with EN 1504-7 as part of the Sika® repair system. It is the first component of the system, followed by the application of Sika MonoTop® or SikaEmaco® concrete repair mortars.
Tensile Adhesion Strength
after 28 days | ≥ 1.5 MPa |
Coefficient of Thermal Expansion
18·10-6 1/K | (EN 1770) |
Corrosion Test
Pass | (EN 15183) |
Shear Adhesion
Comparison of coated steel to concrete to uncoated steel to concrete (pull-out test) | Passed (≥ 80 %) |
Diffusion resistance to carbon dioxide
for 1.9 mm of Product | Sd = 42 m |
Application
Mixing Ratio
The Product comes in pre-packed units with the correct mixing ratio.
Product Temperature
Maximum | +30 °C |
Minimum | +5 °C |
Ambient Air Temperature
Maximum | +30 °C |
Minimum | +5 °C |
Substrate Temperature
Maximum | +30 °C |
Minimum | +5 °C |
Pot Life
At +20 °C | 3 hours |
Pot life depends on temperature
Note: Pot life will be shorter at higher temperatures. Pot life will be longer at lower temperatures.
Application Time
If applying the Product as bonding primer, respect the maximum waiting time before wet on wet application of Sika repair mortars and normal-setting concrete:
Temperature | Maximum waiting time |
+5 °C | 6 hours |
+10 °C | 4 hours |
+20 °C | 2 hours |
+30 °C | 1 hour |
Waiting Time / Overcoating
As reinforcement protection primer between first and second coat:
Temperature | Minimum waiting time |
+5 °C | 8–12 hours |
+10 °C | 4–6 hours |
+20 °C | 2–3 hours |
+30 °C | 1–2 hours |
As reinforcement protection primer between second coat and subsequent repair mortar application:
Temperature | Minimum waiting time |
+5 °C | 30 hours |
+10 °C | 24 hours |
+20 °C | 18 hours |
+30 °C | 12 hours |
Consumption
AS REINFORCEMENT CORROSION PROTECTION
For a total layer thickness of 2 mm, in two layers of 1 mm thickness each:
Rebar diameter | Amount of Product per metre |
8 mm | 120 g/m (60 g/m per layer) |
16 mm | 240 g/m (120 g/m per layer) |
AS BONDING PRIMER ON MINERAL SURFACES
1.5–2.0 kg powder per m² and mm layer thickness, depending on substrate conditions
Note: Consumption data is theoretical and does not allow for any additional material due to surface porosity, surface profile, variations in level, wastage or any other variations. Apply the Product to a test area to calculate the exact consumption for the specific substrate conditions and proposed application equipment.
SUBSTRATE PREPARATION
CONCRETE
- Clean the substrate thoroughly so it is free from dust, loose material, surface contamination and material which reduces adhesion, prevents suction or wetting by the repair materials.
- Remove delaminated, weak, damaged and deteriorated concrete and where necessary, sound concrete. Remove using mechanical hand-held tools, high or ultra-high-pressure water blasting equipment.
- Remove sufficient concrete from around corroded reinforcement to allow cleaning, application of a corrosion protection coating (where required) and compaction of the concrete repair mortar.
- Prepare repair surface areas in simple square or rectangular layouts to avoid shrinkage stress concentrations and cracking while the repair material cures. This can also avoid structural stress concentrations from thermal movement and loading during the service life.
STEEL REINFORCEMENT
- Remove rust, scale, mortar, concrete, dust and other loose and deleterious material which reduces bond or contributes to corrosion.
- Prepare surfaces to bright steel, Sa 2 (ISO 8501-1), using abrasive blast cleaning or high-pressure water blasting equipment.
PRE-WETTING
Sufficient saturation of the concrete substrate prior to application enables the mortar to gain its full mechanical properties.
- Thoroughly pre-wet the prepared concrete substrate for a minimum of 2 hours before application.
- Keep the surface wet and do not allow to dry.
- The final pre-wetted surface must achieve a dark matt appearance (saturated surface dry).
MIXING
- Shake parts A and B before opening.
- Pour the liquid parts A and B into a clean mixing vessel.
- Mix for 30 seconds with a low speed (< 250 rpm) electric drill mixer.
- While mixing parts A and B, slowly add powder part C. Avoid entraining air.
- IMPORTANT Do not add any water to the mix. Mix thoroughly for at least for 3 minutes until a uniform consistency is achieved.
- Leave to stand for 5–10 minutes until the mixed coating material exhibits a brushable, weakly dripping consistency.
APPLICATION
IMPORTANT
Strictly follow installation procedures
Strictly follow installation procedures as defined in Method Statements, application manuals and working instructions which must always be adjusted to the actual site conditions.
IMPORTANT
Risk of cracking due to application in direct sun or strong winds
- Do not apply the Product in direct sun, strong winds or both.
REINFORCEMENT CORROSION PROTECTION
Preconditions
If using spray equipment, the substrate has been protected from overspray.
- Use a clean brush or spraying equipment to apply a first coat 1 mm thick to cover the reinforcement bars.
- When the first coat is fingernail-hard, apply a second coat 1 mm thick.
- Wait until completely dry before applying repair mortar.
BONDING PRIMER
- Remove excess water from within the surface pores and cavities with a clean sponge.
- Use a medium-hard brush or spray gun to apply the Product over the complete substrate surface. Press the Product well into the substrate to form a thin layer, filling surface pores or cavities.
- Apply the subsequent layer of repair mortar wet on wet.
CURING TREATMENT
Protect the fresh mortar from rain while the material has not yet set.
CLEANING OF TOOLS
Clean all tools and application equipment with water immediately after use. Hardened material can only be removed mechanically.